Planned vs reactive maintenance, and why the balance drives budgets.

Every strata building runs on a mix of planned and reactive work. The ratio between the two is the strongest signal of how well a building is being stewarded, and the variable most directly tied to special-levy risk.

Blog/Maintenance·7 min read

Scope
Maintenance

Two kinds of work, two different cost curves

Planned maintenance is work scheduled before failure. Annual fire safety certification, the membrane re-coat at year ten, the seasonal gutter clean, the trades visit that closes a deficiency from the last inspection. Scope is known, cost is budgeted, timing is the building's choice.

Reactive maintenance is work the building did not choose. The overnight leak, the parkade slab that fails inspection, the boiler that quits in February, the order to comply after a fire inspector visit. The repair is necessary, but cost, timing, and scope are all dictated by the failure.

Maintenance

Why the ratio matters more than the totals

Two buildings can spend the same dollar amount on maintenance in a year and end up in very different positions. The one weighted toward planned work has predictable budgets, a flat year-over-year cost curve, and a depreciation report that still matches reality.

The reactive one absorbs emergency mobilization fees, collateral damage to finishes, and the contingency draw-downs that make a special levy more likely at the next AGM.

Maintenance

How the shift actually happens

The move from reactive to planned does not happen through better intentions. It happens through a current condition record that makes the next twelve months of likely work visible before it is urgent.

Each SENTiNEL finding is photographed, located, and ranked by severity. The council sees what to act on now, what to schedule, and what to monitor. Over a few cycles the reactive column shrinks because the work that used to arrive as a surprise is already on the planned list.

FAQ

Common questions about this topic.

Is planned maintenance always cheaper than reactive?
Per-item, yes. The bigger savings come from avoided collateral damage, avoided emergency mobilization, and avoided special levies on work that could have been budgeted across the operating fund.
How do strata buildings shift the balance toward planned work?
By keeping a current condition record of the building, tying it to the depreciation report, and reviewing it at council and AGM cadence.
Go deeper

Full primer on the resources hub

Planned vs reactive maintenance for strata

The longer-form primer on the resources hub covers this topic with the full reference structure, expanded FAQ, and related service routes.

Next step

Bring a construction-led record to your building.

Property Intelligence Loading

Deterioration is inevitable.
Surprise is not.

Your asset is only as sound as the envelope that surrounds it. Start with a short virtual presentation. We walk through what Sentinel does, answer questions, and let you decide if it fits. No proposal, no commitment, no pressure.